国产精品熟女一区二区_中国熟女仑乱hd_国产欧美久久久精品影院_国内精品伊人久久久久av,97国产色视频在线观看,国产精品无码A∨精品性色,国产亚洲熟女电影院,欧美曰韩国产黄色视频

您好,歡迎訪問山東燊赫通風(fēng)設(shè)備有限公司網(wǎng)站!

服務(wù)熱線

13210558111

山東通風(fēng)管道加工設(shè)備生產(chǎn)的風(fēng)管常出現(xiàn)的問題

來源:http://www.zqnsyh.com/     發(fā)布時(shí)間:2020-09-02  

通風(fēng)管道加工是通風(fēng)和空氣調(diào)節(jié)系統(tǒng)的重要組成部分,大部分都是由風(fēng)管加工設(shè)備(如風(fēng)管生產(chǎn)線)制成。可是因?yàn)楦鞣N各樣的原因,可能導(dǎo)致風(fēng)管加工設(shè)備加工而成的風(fēng)管出現(xiàn)問題。
Ventilation duct processing is an important part of ventilation and air conditioning system, most of which are made by duct processing equipment (such as duct production line). However, due to various reasons, it may lead to problems in the air duct processed by air duct processing equipment.
1、加工資料未達(dá)標(biāo)
1. Processing data not up to standard
(1)表現(xiàn):板材外表不平整,厚度不均勻,有明顯的壓痕、裂紋、砂眼、結(jié)疤和銹蝕等狀況;風(fēng)管平面下沉,旁邊面向外凸起,有明顯的變形。
(1) Performance: the surface of the board is not smooth, the thickness is not uniform, there are obvious indentation, cracks, sand holes, scab and rust, etc.; the plane of the air duct sinks, the side faces to the outside, and has obvious deformation.
(2)影響:工作時(shí)風(fēng)管漏風(fēng),空調(diào)負(fù)荷增加,同時(shí)風(fēng)壽數(shù)和性能被影響。
(2) Impact: air leakage in the air duct, air conditioning load increases, and the number of air life and performance are affected.
(3)原因:資料不合格,不能滿意制造風(fēng)管的需求。
(3) Cause: the data is not qualified, and the requirement of manufacturing air duct is not satisfied.
(4)辦法:在使用風(fēng)管加工設(shè)備制造風(fēng)管前,要先檢查資料出廠合格證書和資料質(zhì)量證明還有外觀厚度等,確保資料是可用的。
(4) Method: before using the air duct processing equipment to manufacture the air duct, we should first check the data factory certificate, data quality certificate and appearance thickness to ensure that the data is available.
2、風(fēng)管翹角及彎頭角度不準(zhǔn)
2. Air duct warping angle and elbow angle are not accurate
(1)表現(xiàn):矩形風(fēng)管兩相對平面、兩端面不平行;折角不平直;對角線不相等;咬口不嚴(yán)。
 
(1) Performance: two relative planes and two end faces of rectangular air duct are not parallel; inflection angle is not straight; diagonal line is not equal; bite is not tight.
山東通風(fēng)管道
Shandong ventilation pipeline
(2)影響:會使風(fēng)管連接受力不均勻,安裝后的風(fēng)管不平直,法蘭盤墊片不緊密,系統(tǒng)漏風(fēng),造成空調(diào)負(fù)荷損失,而且縮短使用壽數(shù)。
(2) Influence: it will make the air duct connection stress uneven, the air duct after installation is not straight, the flange gasket is not tight, the system air leakage, resulting in air conditioning load loss, and shorten the service life.
(3)原因:板下料放樣不準(zhǔn)確;風(fēng)管兩兩平行,相對面的板料長度和寬度不相等。
(3) Reasons: the layout of plate cutting is not accurate; the air duct is parallel to each other, and the sheet metal length and width on the opposite side are not equal.
(4)辦法:展開下料時(shí),應(yīng)對板料嚴(yán)厲角方,對每片板料的長度、寬度以及查驗(yàn)對角線,使它們的偏差控制在答應(yīng)范圍內(nèi);下料后的板料,應(yīng)將風(fēng)管相對面的兩片板料重合查驗(yàn)尺寸準(zhǔn)確性。
(4) Methods: when blanking, the sheet metal should be strictly angled, and the length, width and diagonal lines of each sheet should be checked to make their deviation within the allowable range; after blanking, the two sheets opposite to the air duct should be overlapped to check the dimensional accuracy.
以上便是關(guān)于山東通風(fēng)管道加工設(shè)備生產(chǎn)的風(fēng)管常出現(xiàn)的問題相關(guān)介紹,希望對您的生活提供有效幫助,感謝您的閱讀與支持,了解更多請持續(xù)關(guān)注我們。
The above is about Shandong ventilation duct processing equipment production of air duct problems related to the introduction, hope to provide effective help to your life, thank you for your reading and support, learn more, please continue to pay attention to us.

上一篇:如何避免通風(fēng)管道加工后堵塞
下一篇:通風(fēng)管道加工前后的注意事項(xiàng)

临沭县| 商都县| 陇南市| 东丽区| 广平县| 六安市| 合水县| 龙游县| 鹤山市| 诸城市| 阿拉善右旗| 东兰县| 阳泉市| 河源市| 托克逊县| 屏山县| 高安市| 福泉市| 达日县| 宜昌市| 应城市| 嘉善县| 无为县| 商南县| 南昌县| 洞头县| 河源市| 大名县| 常熟市| 中西区| 精河县| 泽州县| 鄯善县| 滦南县| 澳门| 恭城| 垣曲县| 离岛区| 洛南县| 合江县| 星子县|